Repository landing page

We are not able to resolve this OAI Identifier to the repository landing page. If you are the repository manager for this record, please head to the Dashboard and adjust the settings.

Scheduling of unit-length jobs with bipartite incompatibility graphs on four uniform machines

Abstract

In the paper we consider the problem of scheduling n identical jobs on 4 uniform machines with speeds s1 ≥ s2 ≥ s3 ≥ s4, respectively. Our aim is to find a schedule with a minimum possible length. We assume that jobs are subject to some kind of mutual exclusion constraints modeled by a bipartite incompatibility graph of degree Δ, where two incompatible jobs cannot be processed on the same machine. We show that the general problem is NP-hard even if s1 = s2 = s3. If, however, Δ ≤ 4 and s1 ≥ 12s2, s2 = s3 = s4, then the problem can be solved to optimality in time O(n1.5). The same algorithm returns a solution of value at most 2 times optimal provided that s1 ≥ 2s2. Finally, we study the case s1 ≥ s2 ≥ s3 = s4 and give a 32/15-approximation algorithm running also in O(n1.5) time

Similar works

Full text

thumbnail-image

Biblioteka Nauki - repozytorium artykułów

redirect
Last time updated on 20/05/2022

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.