Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times

Abstract

The official published version of the article can be found at the link below.A two-machine flowshop scheduling problem is addressed to minimize setups and makespan where each job is characterized by a pair of attributes that entail setups on each machine. The setup times are sequence-dependent on both machines. It is shown that these objectives conflict, so the Pareto optimization approach is considered. The scheduling problems considering either of these objectives are NP-hard , so exact optimization techniques are impractical for large-sized problems. We propose two multi-objective metaheurisctics based on genetic algorithms (MOGA) and simulated annealing (MOSA) to find approximations of Pareto-optimal sets. The performances of these approaches are compared with lower bounds for small problems. In larger problems, performance of the proposed algorithms are compared with each other. Experimentations revealed that both algorithms perform very similar on small problems. Moreover, it was observed that MOGA outperforms MOSA in terms of the quality of solutions on larger problems.Partial Funding from EPSRC under grant EP/D050863/1

Similar works

This paper was published in Brunel University Research Archive.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.