Repository landing page

We are not able to resolve this OAI Identifier to the repository landing page. If you are the repository manager for this record, please head to the Dashboard and adjust the settings.

Innovation strategy in industry: case of the scheduling problem on parallel identical machines

Abstract

In this paper, we propose an innovation strategy in the industry (case of the scheduling problem on two parallel identical machines), with the objective of minimizing the weighted sum of the end dates of jobs, this problem is NP-hard. In this frame, we suggested a novel heuristics: (H1), (H2), (H3), with two types of neighborhood (neighborhood by SWAP and neighborhood by INSERT). Next, we analyze the incorporation of three diversification times (T1), (T2), and (T3) with the aim of exploring unvisited regions of the solution space. It must be noted that job movement can be within one zone or between different zones. Computational tests are performed on 6 problems with up to 2 machines and 500 jobs

Similar works

Full text

thumbnail-image

DIALNET

redirect
Last time updated on 22/11/2022

This paper was published in DIALNET.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.