Repository landing page

We are not able to resolve this OAI Identifier to the repository landing page. If you are the repository manager for this record, please head to the Dashboard and adjust the settings.

Factors Influencing Safety on Construction Projects (fSCPs): Types and Categories

Abstract

Due to the fact of activity, environment and work dynamics, the construction industry is characterised by high accident rates. Different initiatives have emerged to reduce these figures, which focus on using new methodologies and technologies for safety management. Therefore, it is essential to know the key factors and their influence on safety in construction projects (fSCPs) to focus efforts on these elements. Through a systematic literature review, based on PRISMA methodology, this article identifies, describes and categorises 100 factors that affect construction safety. It thus contributes by providing a comprehensive general framework, unifying previous studies focused on specific geographic areas or case studies with factors not considered or insufficiently disaggregated, along with an absence of classifications focused on understanding where and how factors affect the different dimensions of construction projects. The 100 factors identified are described and categorised according to the dimensions and aspects of the project in which these have an impact, along with identifying whether they are shaping or immediate factors or originating influences for the generation of accidents. These factors, their description and classification are a key contribution to improving the systematic creation of safety and generating training and awareness materials to fully develop a safety culture in organisations

Similar works

Full text

thumbnail-image

Directory of Open Access Journals

redirect
Last time updated on 06/02/2022

This paper was published in Directory of Open Access Journals.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.