Repository landing page

We are not able to resolve this OAI Identifier to the repository landing page. If you are the repository manager for this record, please head to the Dashboard and adjust the settings.

Hump Yard Track Allocation with Temporary Car Storage

Abstract

In rail freight operation, freight cars need to be separated and reformed into new trains at hump yards. The classification procedure is complex and hump yards constitute bottlenecks in the rail freight network, often causing outbound trains to be delayed. One of the problems is that planning for the allocation of tracks at hump yards is difficult, given that the planner has limited resources (tracks, shunting engines, etc.) and needs to foresee the future capacity requirements when planning for the current inbound trains. In this paper, we consider the problem of allocating classification tracks in a rail freight hump yard for arriving and departing trains with predetermined arrival and departure times. The core problem can be formulated as a special list coloring problem. We focus on an extension where individual cars can temporarily be stored on a special subset of the tracks. An extension where individual cars can temporarily be stored on a special subset of the tracks is also considered. We model the problem using mixed integer programming, and also propose several heuristics that can quickly give feasible track allocations. As a case study, we consider a real-world problem instance from the Hallsberg Rangerbangård hump yard in Sweden. Planning over horizons over two to four days, we obtain feasible solutions from both the exact and heuristic approaches that allow all outgoing trains to leave on time

Similar works

This paper was published in Software institutes' Online Digital Archive.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.