Repository landing page

We are not able to resolve this OAI Identifier to the repository landing page. If you are the repository manager for this record, please head to the Dashboard and adjust the settings.

Colegio internado de lzarra Vitoria – España

Abstract

This new pavilion completes the female boarding school and an attempt has been made to integrate the entire unit into the surrounding landscape. For greater economy and shorter construction time, systems have been selected for the greatest possible use of prefabricated elements as well as modular building units. Different prefabrication systems have been used for the common zones, auditoriums, bedrooms and dining room and the building has been covered with prefabricated timber trusses, compressed wood pulp boards and cement tiles. The College is equipped with heating, fire extinction appliances and ventilation in the bedrooms. Within the framework of modern technology the results fulfill the aims set up by the proprietors.Con este nuevo pabellón exento se completa el internado masculino existente, cuidando de integrar el conjunto edificado en el paisaje circundante. En beneficio de las máximas economía y rapidez de construcción, se han elegido sistemas que permitan la mayor utilización de elementos prefabricados, procurando acudir a una modulación rígida donde ha sido posible. Se emplean diferentes sistemas de prefabricación para las zonas comunes, aulas y comedor y dormitorios, cubriendo el edificio con cerchas prefabricadas de madera, tableros aglomerados y tejas de cemento. El Colegio está dotado de calefacción, protección contra incendios y ventilación forzada en dormitorios y aseos. El resultado satisface las aspiraciones expuestas por la propiedad, dentro de la tecnología moderna

Similar works

This paper was published in Informes de la Construcción (E-Journal).

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.