Repository landing page

We are not able to resolve this OAI Identifier to the repository landing page. If you are the repository manager for this record, please head to the Dashboard and adjust the settings.

A New Approach to Blending and Loading Problem of Molten Aluminum

Abstract

The problems of blending electrolyzer and multi-constraint optimization of electrolytic aluminum scheduling in the electrolytic aluminum production process were addressed. Based on a mathematical model analysis, a novel hybrid optimization algorithm is proposed for optimization of blending together the molten aluminum in different electrolytic cells. An affinity degree function was designed to represent the path of aluminum scheduling. The mutation operators were designed to implement the transformation of electrolyzer combination and change the route of loading. A typical optimization example from an aluminum plant in northwest China is given in this paper, the results of which demonstrate the effectiveness of the proposed method

Similar works

Full text

thumbnail-image

Neliti

redirect
Last time updated on 18/10/2017

This paper was published in Neliti.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.