Repository landing page

We are not able to resolve this OAI Identifier to the repository landing page. If you are the repository manager for this record, please head to the Dashboard and adjust the settings.

Two-machine flow shop with dynamic storage space

Abstract

© 2020, The Author(s). The publications on two-machine flow shop scheduling problems with job dependent storage requirements, where a job seizes a portion of the storage space for the entire duration of its processing, were motivated by various applications ranging from supply chains of mineral resources to multimedia systems. In contrast to the previous publications that assumed that the availability of the storage space remains unchanged, this paper is concerned with a more general case when the availability is a function of time. It strengthens the previously published result concerning the existence of an optimal permutation schedule, shows that the variable storage space availability leads to the NP-hardness in the strong sense even for unit processing times, and presents a polynomial-time approximation scheme together with several heuristic algorithms. The heuristics are evaluated by means of computational experiments

Similar works

Full text

thumbnail-image

OPUS - University of Technology Sydney

redirect
Last time updated on 20/04/2021

This paper was published in OPUS - University of Technology Sydney.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.