Repository landing page

We are not able to resolve this OAI Identifier to the repository landing page. If you are the repository manager for this record, please head to the Dashboard and adjust the settings.

How many fast-charging stations do we need along European highways?

Abstract

For a successful market take-up of plug-in electric vehicles, fast-charging stations along the highway network play a significant role. This paper provides results from a first study on estimating the minimum number of fast-charging stations along the European highway network of selected countries (i.e., France, Germany, the Benelux countries, Switzerland, Austria, Denmark, the Czech Republic, and Poland) and gives an estimate on their future profitability. The combination of a comprehensive dataset of passenger car trips in Europe and an efficient arc-cover-path-cover flow-refueling location model allows generating results for such a comprehensive transnational highway network for the first time. Besides the minimum number of required fast-charging stations which results from the applied flow-refueling location model (FRLM), an estimation of their profitability as well as some country-specific results are also identified. According to these results the operation of fast-charging stations along the highway will be attractive in 2030 because the number of customers per day and their willingness to pay for a charge is high compared to inner-city charging stations. Their location-specific workloads as well as revenues differ significantly and a careful selection of locations is decisive for their economic operation

Similar works

Full text

thumbnail-image

HSSS - Hochschulschriftenserver der SLUB

redirect
Last time updated on 18/02/2023

This paper was published in HSSS - Hochschulschriftenserver der SLUB.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.