Repository landing page

We are not able to resolve this OAI Identifier to the repository landing page. If you are the repository manager for this record, please head to the Dashboard and adjust the settings.

Heuristic Solution For Separated Manufacturing Process

Abstract

Downtime is a major issue for manufactures. Downtime may occur from breakdowns, quality issues, lack of manpower, lack of materials, or in this case a lack of storage containers. A manufacturing system was studied that consists of an injection machine that supplies two assembly lines. The injection machine suffered from frequent downtime from lack of containers. The process was analyzed for root cause of downtime. After analysis of the system it was found that the injection process had high variability in production quantity and quality. The scheduling scheme called for production until all available containers were full regardless of actual demand. This created times when Injection would have to wait for Assembly to empty containers thus causing downtime. A production model was developed to compare different scheduling schemes for cost effectiveness. An economic order quantity based schedule was found to have least cost

Similar works

This paper was published in University of Tennessee, Knoxville: Trace.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.