Repository landing page

We are not able to resolve this OAI Identifier to the repository landing page. If you are the repository manager for this record, please head to the Dashboard and adjust the settings.

Abstract

The purpose of this document, Deliverable 4.1, is to describe the Current Supply Profile for its further use in different threads by the DATASET2050 Horizon 2020 coordination and support action. This deliverable comprises the work conducted in order to define and list the door-to-door mobility supply components, as described in task 4.1. It presents the baseline supply situation with respect to current door-to-door trips within Europe, including an assessment, identification and mode of the mobility services currently available in Europe (airport access/egress times, airport processes times etc.) All the above will allow the DATASET2050 project partners to determine the time required to undertake the current processes involved from leaving the place of origin (the "Door") to the point of arrival at the airport (the "Kerb"), from the Kerb to the moment the passenger has had their boarding card scanned immediately prior to embarkation (the "Gate"). The same approach is used for the Gate-to-Gate processes (including connecting flights and the transfer process), and finally Gate-to-Kerb and Kerb-to-Door. The inherent asymmetries of what are, in principle, symmetric processes have been assessed (e.g.: Door-to-Kerb vs. Kerb-to-Door). D4.1 directly feeds the supply side of the mobility model that will be run in WP5 of DATASET2050

Similar works

This paper was published in WestminsterResearch.

Having an issue?

Is data on this page outdated, violates copyrights or anything else? Report the problem now and we will take corresponding actions after reviewing your request.